CONSTRUCTION POLICY



The Association has an active Architectural Committee. The members are appointed by the Board of Directors and are usually members of the Board. This committee is responsible for reviewing and approving, subject to the CC&Rs, any new development on unimproved lots or remodeling of existing buildings.

Prior to the commencement of any new construction, a $10,000 bond, letter of credit, or cash escrow in favor of the Association is required for common area landscape or other improvements created or disturbed during construction.

GUIDELINES: The Association is registered with the City and will be notified when any building permit is applied for in the Square. It should be noted that the City can not and will not enforce any Association CC&R requirements. However, the Association will take an active part in the permit process and will require compliance with the rules and regulations.

It is recommended that the owner/developer review the appropriate paragraphs of the CC&Rs regarding new construction.

Excavation: Before any excavation takes place, the Association’s property management firm should be contacted to address existing irrigation lines, power lines, common area signs, etc. This is in addition to the normal “blue stake” requirements.

Dues Change: At the date construction begins (usually the placement of the limits of disturbance fencing), the member's dues will immediately be increased from that of a vacant lot to that of a lot with improvements. The size of the improvements will be estimated from the plans provided to the Association for review, and will be re-measured upon completion of the building. For example, for a 3,000 square foot lot with a proposed two story building, constructed lot line to lot line, the total square footage used for dues calculations will be 9,000. The increased dues will be effective on the first day of the next quarter (the first day of July, October, January or April).

A detailed landscape plan surrounding the building lot is required. The plan should provide specifics for disturbed areas, re-vegetation, and new landscape. It should also address any needed connecting sidewalk(s) to existing common area sidewalks and/or to parking lots.

Common Area Irrigation: The Association will consider connecting its existing irrigation system to a new or extended system if the connection is financially and functionally feasible (water pressure, existing or new zones, timers, heads , etc.). If it is not possible to maintain the performance level of the existing system, the owner/developer will be responsible for installing and maintaining a separate irrigation system, run from the lot's water connection and power source.

Common Area Landscape Maintenance: The Association must approve the proposed landscape plan. If the maintenance of the proposed landscape is not labor intensive, such as sod or bark covered areas, the Association will assume maintenance responsibility (mowing, fertilizing, etc.) after the area is established. If the area has extensive ornamental planting of annuals, perennials, ground cover, etc., the individual lot owner will be responsible for maintaining the area.

Common Area Encroachment: The City and the Association have an approved procedure to allow most types of encroachments into the common area. The Association and the property owner execute a “Party Wall Agreement” that is prepared jointly by our legal counsel and the City to allow such encroachments. Use of the terms “party wall” and “sale and leaseback” do not have the customary meaning but were selected by both parties as the most appropriate and enforceable language. To view the full text of the agreement, click below:

PROSPECTOR SQUARE PARTY WALL AGREEMENT

Roof Drains: The Association has a drain system running through the interior of the walking mall. If it is at all possible, the owner/developer is required to connect the building's roof drains to this system. If this is not possible, the affected area of the roof drain(s) must be approved by the Association.

Construction Staging: The Association and the City require a construction staging plan. This plan needs to include the placement of garbage containers and portable restrooms, and location designations for materials delivery and parking during construction, in addition to other items as deemed site appropriate. It is common to allow the use of parking stalls or a portion of the building's parking lot frontage for staging. The repair of any disturbance or damage to the common area will be the responsibility of the owner/developer. All efforts will be taken to ensure safe and reasonable use of the Association's common areas for both the new construction activity and for the operation of surrounding businesses.

Additional information on the roles and responsibilities of the Architectural Committee are specifically outlined in the CC&Rs.